Polyethylene Pipe Installation

Polyethylene pipe Installation

Relevant Standard AS/NZS 2033:2008

HDPE manifold out feed aerobic water treatment

Polyethylene pipe manifold out feed aerobic water treatment

Specialized tools and equipment used in the Polyethylene pipe & installation, repair, testing and commissioning of fittings is essential.

Temperature considerations must also be taken into account and pipe may need to be de rated due to thermal effects of environment and service temperature.

Only trained and certified operators shall carry out fusion jointing and acceptable methods being electro-fusion, butt-fusion and socket-fusion.

Anaerobic waste treatment piping Installation.

Anaerobic waste treatment Polyethylene piping Installation

Polyethylene pipe Installation Sliding supports shall provide a guide, without restraint, for the axial movement of pipes subject to thermal expansion.

Polyethylene pipe Installation anaerobic In-fluent

Polyethylene pipe & pump Installation anaerobic In-fluent

Polyethylene pipe Installation Fixed supports shall restrain movement of the pipe or fitting by being clamped to the structure.

HDPE pipe welding & Installation of manifold to bio reactor

Polyethylene pipe Installation of manifold to bio reactor

Polyethylene pipe Installation Provision for expansion must be made for thermal movement by fitting expansion joints, unless the movement can be controlled by other means.

Polyethylene pipe welding & Installation to Alfa Laval separator waste water treatment

Polyethylene pipe Installation to Alfa Laval separator waste water treatment

Pressure testing

Polyethylene pipes may require special processes since they may continue to expand significantly throughout the test period.

When a PE pipe is sealed under a test pressure there may be creep even in a leak free system, due to the response and stress relaxation of the PE material.

Polyethylene pipe welding & Installation offset sewerage treatment Malabar

Polyethylene pipe welding & Installation offset sewerage treatment Malabar

It may be considered good practice to initially fill the pipe with water twenty four hours prior to pressure testing to allow pipe temperature equilibrium with the water.